Services

Services

DESIGN, ENGINEERING & CONSTRUCTION MANAGEMENT

TERMINAL ENGINEERING

PERMITTING & PROJECT MANAGEMENT

INSPECTION & COMPLIANCE

IMAGE CONVERSION PROGRAMS

  • Site Planning & Civil Engineering
  • Petroleum Pump & Tank Design
  • Feasibility & Due Diligence Studies
  • Lock Out Tag Out Procedure Manuals
  • Design and Development of Standards for Underground Storage Tanks (UST)
  • P&ID Drawings for Bulk Petroleum Aboveground Storage Facilities
  • Overfill Protection Surveys
  • 3D Renderings
  • Site Planning & Civil Engineering
  • Design and Development of Standards for Aboveground Storage Tanks (AST)
  • Project Management
  • Develop Lock Out Tag Out, Operational and Maintenance Procedures
  • Create P&ID Drawings
  • Overfill and Fire Protection Surveys
  • Survey Site to Assess its Condition and Requirements
  • Define the Scope of Work for Each Facility
  • Develop Project Budget and Timing
  • Define Material Specifications and Suppliers
  • Qualify Vendors and Contractors and Bid Projects
  • Investigate State and Local Regulations and Incorporate Regulatory Requirements Into Plans
  • Planning, Building, & Zoning Department Submittals
  • Meeting with City Planners to Determine the Best Course of Action
  • Presenting Proposed Work to Planning Commissions and Boards of Zoning Appeals
  • Negotiating Issues and Details
  • Secure All and Various Permits
  • Manage the Construction Process
  • Secure the Final Certificate of Occupancy
  • Perform Critical Path Third Party Inspections
  • Direct UST Installation & Provide Oversight Expertise
  • Industry Certified and Field-Tested Inspectors
  • Entire Field Staff is Safety Certified Through API’s Work Safe Safety Key Program
  • Inspect & Document all Phases of the Underground Storage Tank Installation Process
  • Provide 30 Day, 60 Day, and 11 Month Follow-up Inspections
  • Exterior and Interior Conversions for Gasoline Service Stations, Restaurants, and More
  • Survey and Assess Facility Conditions and Requirements for Individual or Multiple Locations Across the United States
  • Define the Scope of Work for Each Facility
  • Apply the Architectural Design to Each Specific Architectural Style
  • Create AutoCAD Drawings
  • Develop Project Budget and Timing
  • Define Material Specifications and Suppliers
  • Qualify Vendors and Contractors and Bid Projects
  • Secure All and Various Permits
  • Manage the Construction Process
  • Secure the Final Certificate of Occupancy

DESIGN, ENGINEERING & CONSTRUCTION MANAGEMENT

  • Site Planning & Civil Engineering
  • Petroleum Pump & Tank Design
  • Feasibility & Due Diligence Studies
  • Lock Out Tag Out Procedure Manuals
  • Design and Development of Standards for Underground Storage Tanks (UST)
  • P&ID Drawings for Bulk Petroleum Aboveground Storage Facilities
  • Overfill Protection Surveys
  • 3D Renderings

TERMINAL ENGINEERING

  • Site Planning & Civil Engineering
  • Design and Development of Standards for Aboveground Storage Tanks (AST)
  • Project Management
  • Develop Lock Out Tag Out, Operational and Maintenance Procedures
  • Create P&ID Drawings
  • Overfill and Fire Protection Surveys

PERMITTING & PROJECT MANAGEMENT

  • Survey Site to Assess its Condition and Requirements
  • Define the Scope of Work for Each Facility
  • Develop Project Budget and Timing
  • Define Material Specifications and Suppliers
  • Qualify Vendors and Contractors and Bid Projects
  • Investigate State and Local Regulations and Incorporate Regulatory Requirements Into Plans
  • Planning, Building, & Zoning Department Submittals
  • Meeting with City Planners to Determine the Best Course of Action
  • Presenting Proposed Work to Planning Commissions and Boards of Zoning Appeals
  • Negotiating Issues and Details
  • Secure All and Various Permits
  • Manage the Construction Process
  • Secure the Final Certificate of Occupancy

INSPECTION & COMPLIANCE

  • Perform Critical Path Third Party Inspections
  • Direct UST Installation & Provide Oversight Expertise
  • Industry Certified and Field-Tested Inspectors
  • Entire Field Staff is Safety Certified Through API’s Work Safe Safety Key Program
  • Inspect & Document all Phases of the Underground Storage Tank Installation Process
  • Provide 30 Day, 60 Day, and 11 Month Follow-up Inspections

IMAGE CONVERSION PROGRAMS

  • Exterior and Interior Conversions for Gasoline Service Stations, Restaurants, and More
  • Survey and Assess Facility Conditions and Requirements for Individual or Multiple Locations Across the United States
  • Define the Scope of Work for Each Facility
  • Apply the Architectural Design to Each Specific Architectural Style
  • Create AutoCAD Drawings
  • Develop Project Budget and Timing
  • Define Material Specifications and Suppliers
  • Qualify Vendors and Contractors and Bid Projects
  • Secure All and Various Permits
  • Manage the Construction Process
  • Secure the Final Certificate of Occupancy